Sarawak ID|Register

Unscheduled Interruption 4 March 2012

Incident: 150mm HDPE main burst. Before Philip Khayak Bridge EP L293 Durin Bazaar.

Affected Area: Durin Bazaar.

Work Done: 4.15pm 4 March 2012


Incident: Main Paip Leaking at main road Taman Sibu Jaya Lorong 8.

Affected Area: Sibu Jaya Lorong 8.

Work Done: 8.55pm 4 March 2012

Quick Link