Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Background: 1 Background: 2 Background: 3 

Last Update: 27 Nov 2020
Version 8.3.0
Unscheduled Interruption 4 March 2012Unscheduled Interruption 4 March 2012

Incident: 150mm HDPE main burst. Before Philip Khayak Bridge EP L293 Durin Bazaar.

Affected Area: Durin Bazaar.

Work Done: 4.15pm 4 March 2012


Incident: Main Paip Leaking at main road Taman Sibu Jaya Lorong 8.

Affected Area: Sibu Jaya Lorong 8.

Work Done: 8.55pm 4 March 2012