» |
23 February 2022 @ 9.00 pm until completion of works Affected area : Lorong Kampung Jeriah 3, 3A & Lorong Jeriah Barat 1 Incident : Interconnection of 160 mm Dia. HDPE main to existing main pipe at Lorong Jeriah Barat 1 |
» |
23 February 2022 @ 9.00 pm until completion of works Affected area : Lorong Kampung Jeriah 3, 3A & Lorong Jeriah Barat 1 Incident : Interconnection of 160 mm Dia. HDPE main to existing main pipe at Lorong Jeriah Barat 1 |