Unscheduled Interruption 23 May 2013
Incident: 150mm D.I main pipe leaking at Jalan Pahlawan Lorong 7A/2
Affected Area: Jalan Pahlawan Lorong 7A/2
Work Done: 2.05 pm repair work done.
Incident: 3/4" Ferrule broken at Jalan Langsat Lorong 5
Affected Area: Jalan Langsat Lorong 5
Work Done: 2.25 pm repair work done.