» |
08 March 2023 @ 09:00 pm until completion of works Affected area : Lorong Gelama 4, Lorong Gelama 5, Lorong Ling Kai Cheng 6, 6A, 6B, 6C, 6D and Lorong Belibas 1A. Incident: Interconnection of 160mm O.D HDPE Main Pipes (ad Hoc Renewal Project). |
» |
08 March 2023 @ 09:00 pm until completion of works Affected area : Lorong Gelama 4, Lorong Gelama 5, Lorong Ling Kai Cheng 6, 6A, 6B, 6C, 6D and Lorong Belibas 1A. Incident: Interconnection of 160mm O.D HDPE Main Pipes (ad Hoc Renewal Project). |