Incident: 280mm HDPE Main pipe leaking at Lot 1344 (after NIRVANA MEMORIAL) between E.P 216 & EP 217, JLN Ulu OYA.
Affected Area: Jln Ulu oya Area
Work Done: 8.45 pm on 9 September 2013
Incident : 225mm HDPE main pipe leaking at Jalan Sibu Jaya Lrg 8E
Affected Area : Jalan Sibu Jaya Lrg 8E
Work Done : 1.30 am on 9 September 2013
Incident : Installation of PRV by NRW contractor at Sg Maaw
Affected Area : Sg Maaw
Work done : 1.55 pm on 9 September 2013